STUDY AND CONSTRUCTION OF THE SETIF TRAMWAY. AN URBAN PROJECT APPROACH?
DOI:
https://doi.org/10.4314/jfas.v13i1.18Keywords:
City project; urban dynamics; Urban management; Pluralization; SetifAbstract
The Setif Tramway project is a significant urban project, mobilizing, strategic and innovative, which has upset the urban dynamics of the city, by its insertion on its primary East-West axis, representing its backbone.
This paper aims the apprehension of this project as a city project, through its development process, to understand its approach, and to identify a new posture which speaks of a management system, where the process of “Pluralization” responds to strategic orientations which aim at complementarity between the strategy of political actors and the needs of citizen actors. The aim is to speak about the design and development phase of the Setif tram project. Allowing researchers to develop a roadmap for their projects and helping decision-makers to pilot and manage such operations.
Downloads
References
[2] Agence National de Développement de l’Investissement, ANDI. Entretien avec Monsieur Mohamed Bouderbali, le Wali de Sétif. 2014.
[3] DPAT wilaya de Sétif. Plan d’aménagement de la wilaya de Sétif. Sétif, 2017.
[4] Direction d'urbanisme et de construction, DUC. Étude intercommunale de Sétif, rapport d'orientation. Sétif, 2010.
[5] Yuksel Proje. Rapport APD, Insertion urbaine. Sétif, 2013.
[6] Arab N. l’activité de projet dans l’aménagement urbain, Processus d’élaboration et modes de pilotage. Thèse de l’Ecole Nationale des Ponts et Chaussées, 2004
[7] Guigou B. améliorer le quotidien des habitants par une gestion concertée ville-bailleurs. Ile-de-France, Paris : GIE Villes et Quartiers ; 2002 p. 32–44.
[8] Montanola A. La gestion urbaine de proximité : nouvel enjeu de la politique de la ville. France : UFR des Science de la Terre et de l'Aménagement Régional, 2001 p. 36–49.
[9] Distler R. Conception et mise en œuvre d'un système de pilotage intégrant la responsabilité sociale de l’entreprise : une méthode combinatoire [thesis]. [France] : HAL Id :tel-01752611, 2018. p. 133–64.
[10] Collet A. L’évaluation, processus clé du pilotage d'un projet de gestion urbaine. Paris : Agence Nationale pour la Rénovation urbaine, 2014 p. 10–8.
[11] Angers M. Initiation pratique à la méthodologie des sciences sociales. Ed CASBAH. Alger, 1997. 65-195.
[12] Albarello L, Digneffe F, Hiernaux J-P, Ruquoy D, Saint-Georges P. Pratiques et méthodes de recherche en sciences sociales. Paris, Armand Colin 1995. P179.
[13] Senoussaoui F. Projet du tramway de Sétif : L’étude de faisabilité arrêtée. LibertéSETIF INFO. 2006.
[14] Egis Rail-Transurb Technirail, EMA. Etude de faisabilité de la première ligne du tramway de Sétif. Sétif, 2008.
[15] Senoussaoui F. Projet du tramway de Sétif : Une enquête de circulation lancée. Liberté SETIF INFO. 2007.
[16] Zoghbi F. Le tramway avance. El MOUJAHID. 2009.
[17] Boutebna N. Le tramway de Sétif sera lancé en travaux avant fin 2013. Liberté SETIF INFO. 2013.
[18] Hedna K. Tramways de Sétif : Les entreprises algériennes écartées du projet au profit des étrangers. Le midi libre SETIF INFO. 2011.
[19] Yuksel Proje. Marché n°05/2012, Etude d'avant-projet détaillé de la première ligne du tramway de Sétif. Sétif, 2012.
[20] CHOUGUIA S. Le descriptif de management : projet d’extension de la première ligne du tramway de Constantine. Cahiers géographiques de l’Ouest N°12-13. 2017 ;213–229.
[21]. Zoghbi F. Appel d'offre pour la réalisation d'un tramway Sétif : La capitale des Hauts-Plateaux sur les rails. L’Expression, Le Quotidien. 2013.
[22] Yuksel Proje. Rapport APD, Impacts sur l’environnement. Sétif, 2013.
[23] Senoussaoui, F. Travaux du tramway à Sétif : Le réseau routier congestionné. Liberté.SETIF INFO.2015.
[24] Beniaiche, K. Tramway de Sétif : Le deuxième tracé contesté. El Watan. 2015.
[25] Beniaiche, K. Les Sétifiens ne veulent pas d’un tramway qui difigure la fontaine d’Ain Fouara. El Watan. 2014.
[26] Madani S. Le tramway de Sétif : Projet urbain ou simple projet de transport. Cahiers Géographiques de l’Ouest n° 12-13, laboratoire EGEAT. 2017 ,169–178.
[27] Zoghbi, F. Nouvelles de Sétif. Le wali sur le chantier du Tramway : Un grand projet structurant. El MOUJAHID.2016.
[28] Boutebna, N. Chantier de réalisation de tramway de Sétif : Les vendredis noirs les turcs. Liberté. SETIF INFO.2016.
[29] Zoghbi, F. Nouvelles de Sétif, Tramway : La dernière ligne droite. El MOUJAHID.2018.
[30] Yuksel Proje. Rapport sur le plan de communication. Sétif, 2016.